The concerted efforts of Grupo Lamosa employees across all the countries where it operates were essential for catching the downwind after the storm and thereby taking advantage of the circumstances: after being forced to halt operations, the company started up production in record time with the flexibility needed to adapt production lines to the new market requirements.
In the face of the contingency, the company developed and implemented protocols to assure the health and safety of the entire Grupo Lamosa team. Training workshops were held to disseminate information on the health crisis and on practices to minimize risk, both inside and outside the company’s work centers. Similarly, a great effort was made to keep the production plant intact, with special attention paid to employees in vulnerable situations.
“Grupo Lamosa made us feel that we were in a safe space, thanks to social distancing measures and the continuous use of protection and sanitizing measures.”
Ana Morán
Grupo Lamosa Design Department